JellyBean
HL01
SMALL
Yorkie, Pom, Maltese, Miniature Poodle, Chihuahua
Scooter
HL+HLL12
MEDIUM
Pug, Scotty, Jack Russel, Maltese Poodle, Terrier
Beach Bum
HL+HLL03
LARGE
Dalmation, Spaniel, Doberman, Boxer
Armed Response
HL+HLL02
X-LARGE
Rottweiler, Bouvier, Ridgeback, Labrador
Special Agent
HL04
XX-LARGE
German Shephard, Bulldog, Bouvier, St. Bernard
Cool Graphix
A wide range of cool graphic ribbons are stitched onto high grade webbing, ensuring your dog sports the latest and greatest.
RogLoc
RogLoc is the Fort Knox of release buckles.
Low Load Technology
LLT technology reduces the load on the Titanium Plastic buckle through the cleverly positioned load ring.
Contoured Plastic Component
ROGZ rounded contoured plastic components ensure that every ROGZ collar fits snuggly.
Die-cast ring
Custom designed die cast ring (no welding). Electroplated chrome for a tarnish free finish.
SPECIFICATIONS
Acetyl Plastic Components, Zinc DieCast Components, Reflective Stitching, Nylon Webbing
Dimensions
|
Size |
Width of Webbing |
Length |
| JellyBean |
SMALL |
11mm | 3/8″ |
1.8m | 71″ |
| Scooter |
MEDIUM |
16mm | 5/8″ |
1.8m | 71″ |
| Beach Bum |
LARGE |
20mm | 3/4″ |
1.8m | 71″ |
| Armed Response |
X-LARGE |
25mm | 1″ |
1.8m | 71″ |
| Special Agent |
XX-LARGE |
40mm | 1 5/8″ |
0,5m I 20” |