In-store Pickup
Order this product now and collect it from a store of your choice.
Find your nearest storeIntroduction:
The Rogz Utility Reflective Stitching Long Dog Leash is designed for dog owners who prioritize safety, durability, and convenience. Perfect for day or night walks, this leash combines high-quality materials with thoughtful features to improve your control and your dog’s safety.
Product Features:
- High Durability: Built with long-lasting components to endure regular use.
- Reflective Stitching: Woven reflective yarn enhances visibility during nighttime walks.
- Safety: Ensures your dog stays securely by your side.
- Waste Bag Holder: Convenient accessory to carry waste bags.
- Improved Control: Helps you easily halt and manage your dog.
Technical Specifications:
- Type: Dog Leash
- Material: Durable webbing with reflective stitching.
- Length: Long leash design for flexibility and freedom.
- Accessory: Built-in waste bag holder.
- Visibility: Reflective yarn for low-light conditions.
- Safety Mechanism: Secure leash clip to prevent straying.
Utility Classic Lead Size Guide:
|
Size |
Webbing Width |
Adjustability |
||
|
mm |
in |
m |
ft |
|
|
S |
11 |
3/8 |
1.8 |
6 |
|
M |
16 |
5/8 |
1.4 |
4.6 |
|
L |
20 |
3/4 |
1.4 |
4.6 |
|
XL |
25 |
1 |
1.2 |
4 |
|
XXL |
40 |
1 5/8 |
0.5 |
1.5 |

































